Construction and Installation of 230 kV Transmission Line from Ardakan Substation to Graphite Electrode Factory
Scope of Work:
Procurement, construction, and installation of a 230 kV transmission line from Ardakan Substation to the Graphite Electrode Factory.
Activity Type: PC (Project Construction)
Location: Yazd, Iran
Client: National Steel Company of Iran
Execution Period: ۲۰۰۶ to 2008
This project involved the design, procurement, and construction of a high-capacity 230 kV transmission line to ensure a reliable and stable power supply for the Graphite Electrode Factory. The installation was completed to meet the operational requirements of the factory while ensuring compliance with national and international standards.